ADCP velocity and pressure data collected by ECOWIND-ACCELERATE project from the Rhyl Flats offshore wind farm in 2022. Instrument was deployed between 08-Sep-2022 and 03-Oct-2022.
Instrument was a Nortek Signature1000 5-beam ADCP bottom mounted on a fixed frame.
| Dyddiad y'i gwnaethpwyd ar gael | 25 Meh 2024 |
|---|---|
| Cyhoeddwr | Prifysgol Bangor University |
| Diwedd cynhyrchu data | 8 Medi 2022 - 3 Hyd 2022 |
Prosiectau
- 1 Wrthi'n gweithredu
-
Ecological impacts of accelerated seabed mobility (EcoWind-ACCELERATE)
Van Landeghem, K. (PY)
9/08/22 → 31/08/27
Project: Ymchwil
Allbwn Ymchwil
- 1 Erthygl
-
Enhanced bed shear stress and mixing in the tidal wake of an offshore wind turbine monopile
Austin, M., Unsworth, C., Van Landeghem, K. & Lincoln, B., 16 Ion 2025, Yn: Ocean Science. 21, 1, t. 81-91 egusphere-2024-2056.Allbwn ymchwil: Cyfraniad at gyfnodolyn › Erthygl › adolygiad gan gymheiriaid
Mynediad agoredFfeil198 Wedi eu Llwytho i Lawr (Pure)
Gweithgareddau
- 1 Mathau o Fusnes a Chymuned - Croesawu ymwelydd allanol, anacademaidd
-
Nortek - SOS meeting: future instruments and collaboration
Austin, M. (Trefnydd), Lincoln, B. (Cyfrannwr), Lucas, T. (Cyfrannwr), Unsworth, C. (Cyfrannwr) & Rippeth, T. (Cyfrannwr)
7 Maw 2025Gweithgaredd: Arall › Mathau o Fusnes a Chymuned - Croesawu ymwelydd allanol, anacademaidd
Dyfynnu hyn
- DataSetCite