ADCP velocity and pressure data collected by ECOWIND-ACCELERATE project from the Rhyl Flats offshore wind farm in 2022. Instrument was deployed between 08-Sep-2022 and 03-Oct-2022.
Instrument was a Nortek Signature1000 5-beam ADCP bottom mounted on a fixed frame.
Instrument was a Nortek Signature1000 5-beam ADCP bottom mounted on a fixed frame.
Date made available | 25 Jun 2024 |
---|---|
Publisher | Prifysgol Bangor University |
Date of data production | 8 Sept 2022 - 3 Oct 2022 |
Projects
- 1 Active
-
Ecological impacts of accelerated seabed mobility (EcoWind-ACCELERATE)
Van Landeghem, K. (PI)
9/08/22 → 31/08/26
Project: Research
Research output
- 1 Article
-
Enhanced bed shear stress and mixing in the tidal wake of an offshore wind turbine monopile
Austin, M., Unsworth, C., Van Landeghem, K. & Lincoln, B., 16 Jan 2025, In: Ocean Science. 21, 1, p. 81-91 egusphere-2024-2056.Research output: Contribution to journal › Article › peer-review
Open AccessFile109 Downloads (Pure)
Activities
- 1 Types of Business and Community - Hosting of external, non-academic visitor
-
Nortek - SOS meeting: future instruments and collaboration
Austin, M. (Organiser), Lincoln, B. (Contributor), Lucas, T. (Contributor), Unsworth, C. (Contributor) & Rippeth, T. (Contributor)
7 Mar 2025Activity: Other › Types of Business and Community - Hosting of external, non-academic visitor