Fersiynau electronig

Dangosydd eitem ddigidol (DOI)

Nowadays, the primary challenge is the Efficient use of energy in all the world. International and regional efforts have been developed to address it, including government agreements and sectorial projetcs between academic, industrial , social and entrepreneurs as well.
Nevertheless, the traditional and well-known strategies applied in particular to generate, storage, distribute and use of the Electrical Power is high exploited. Considering the politics about the responsible production and use of electrical energy in the countries, the HydroElectrical Plants (HEP) accomplish the restricted requirements in this context. England is one of the specific countries that represent the principal equilibrium between efficient in production and use of Electrical Power with the 1/3 of the electrical grid covered by Dinorwig HEP. This plant have been studied and improved with several strategies...

Allweddeiriau

Iaith wreiddiolSaesneg
Dynodwyr Gwrthrych Digidol (DOIs)
StatwsCyhoeddwyd - 16 Hyd 2018
Gweld graff cysylltiadau