Standard Standard

Investigation into a new governor scheme for the Dinorwig pumped-storage hydro plant. / Mansoor, S.P.; Jones, D.I.; King, D.J. et al.
2002. 29-38 Paper presented at Proc. HydroPower and Dams, Kiris, Turkey.

Research output: Contribution to conferencePaper

HarvardHarvard

Mansoor, SP, Jones, DI, King, DJ, Bradley, DA, Aris, FC & Jones, GR 2002, 'Investigation into a new governor scheme for the Dinorwig pumped-storage hydro plant', Paper presented at Proc. HydroPower and Dams, Kiris, Turkey, 3/01/01 pp. 29-38.

APA

Mansoor, S. P., Jones, D. I., King, D. J., Bradley, D. A., Aris, F. C., & Jones, G. R. (2002). Investigation into a new governor scheme for the Dinorwig pumped-storage hydro plant. 29-38. Paper presented at Proc. HydroPower and Dams, Kiris, Turkey.

CBE

Mansoor SP, Jones DI, King DJ, Bradley DA, Aris FC, Jones GR. 2002. Investigation into a new governor scheme for the Dinorwig pumped-storage hydro plant. Paper presented at Proc. HydroPower and Dams, Kiris, Turkey.

MLA

Mansoor, S.P. et al. Investigation into a new governor scheme for the Dinorwig pumped-storage hydro plant. Proc. HydroPower and Dams, Kiris, Turkey, 03 Jan 0001, Paper, 2002.

VancouverVancouver

Mansoor SP, Jones DI, King DJ, Bradley DA, Aris FC, Jones GR. Investigation into a new governor scheme for the Dinorwig pumped-storage hydro plant. 2002. Paper presented at Proc. HydroPower and Dams, Kiris, Turkey.

Author

Mansoor, S.P. ; Jones, D.I. ; King, D.J. et al. / Investigation into a new governor scheme for the Dinorwig pumped-storage hydro plant. Paper presented at Proc. HydroPower and Dams, Kiris, Turkey.

RIS

TY - CONF

T1 - Investigation into a new governor scheme for the Dinorwig pumped-storage hydro plant

AU - Mansoor, S.P.

AU - Jones, D.I.

AU - King, D.J.

AU - Bradley, D.A.

AU - Aris, F.C.

AU - Jones, G.R.

PY - 2002/1/1

Y1 - 2002/1/1

M3 - Paper

SP - 29

EP - 38

T2 - Proc. HydroPower and Dams, Kiris, Turkey

Y2 - 3 January 0001

ER -