Uncertainties in estimates of Reynolds stress and TKE production rate using the ADCP variance method.

Research output: Contribution to journalArticlepeer-review

Standard Standard

Uncertainties in estimates of Reynolds stress and TKE production rate using the ADCP variance method. / Williams, E.; Simpson, J.H.
In: Journal of Atmospheric and Oceanic Technology, Vol. 21, No. 2, 01.02.2004, p. 347-357.

Research output: Contribution to journalArticlepeer-review

HarvardHarvard

APA

CBE

MLA

VancouverVancouver

Williams E, Simpson JH. Uncertainties in estimates of Reynolds stress and TKE production rate using the ADCP variance method. Journal of Atmospheric and Oceanic Technology. 2004 Feb 1;21(2):347-357. doi: 10.1175/1520-0426(2004)021<0347:UIEORS>2.0.CO;2

Author

Williams, E. ; Simpson, J.H. / Uncertainties in estimates of Reynolds stress and TKE production rate using the ADCP variance method. In: Journal of Atmospheric and Oceanic Technology. 2004 ; Vol. 21, No. 2. pp. 347-357.

RIS

TY - JOUR

T1 - Uncertainties in estimates of Reynolds stress and TKE production rate using the ADCP variance method.

AU - Williams, E.

AU - Simpson, J.H.

PY - 2004/2/1

Y1 - 2004/2/1

KW - ENGINEERING

KW - OCEAN

KW - METEOROLOGY & ATMOSPHERIC SCIENCES

U2 - 10.1175/1520-0426(2004)021<0347:UIEORS>2.0.CO;2

DO - 10.1175/1520-0426(2004)021<0347:UIEORS>2.0.CO;2

M3 - Article

VL - 21

SP - 347

EP - 357

JO - Journal of Atmospheric and Oceanic Technology

JF - Journal of Atmospheric and Oceanic Technology

SN - 0739-0572

IS - 2

ER -