Inventory compilation for renewable energy systems: the pitfalls of materiality thresholds and priority impact categories using hydropower case studies
Research output: Contribution to journal › Article › peer-review
Standard Standard
Inventory compilation for renewable energy systems: the pitfalls of materiality thresholds and priority impact categories using hydropower case studies. / Gallagher, J.; Styles, D.; McNabola, A. et al.
In: International Journal of Life Cycle Assessment, Vol. 20, No. 12, 15.10.2015, p. 1701-1707.
In: International Journal of Life Cycle Assessment, Vol. 20, No. 12, 15.10.2015, p. 1701-1707.
Research output: Contribution to journal › Article › peer-review
HarvardHarvard
Gallagher, J, Styles, D, McNabola, A & Williams, AP 2015, 'Inventory compilation for renewable energy systems: the pitfalls of materiality thresholds and priority impact categories using hydropower case studies', International Journal of Life Cycle Assessment, vol. 20, no. 12, pp. 1701-1707. https://doi.org/10.1007/s11367-015-0976-6
APA
Gallagher, J., Styles, D., McNabola, A., & Williams, A. P. (2015). Inventory compilation for renewable energy systems: the pitfalls of materiality thresholds and priority impact categories using hydropower case studies. International Journal of Life Cycle Assessment, 20(12), 1701-1707. https://doi.org/10.1007/s11367-015-0976-6
CBE
Gallagher J, Styles D, McNabola A, Williams AP. 2015. Inventory compilation for renewable energy systems: the pitfalls of materiality thresholds and priority impact categories using hydropower case studies. International Journal of Life Cycle Assessment. 20(12):1701-1707. https://doi.org/10.1007/s11367-015-0976-6
MLA
Gallagher, J. et al. "Inventory compilation for renewable energy systems: the pitfalls of materiality thresholds and priority impact categories using hydropower case studies". International Journal of Life Cycle Assessment. 2015, 20(12). 1701-1707. https://doi.org/10.1007/s11367-015-0976-6
VancouverVancouver
Gallagher J, Styles D, McNabola A, Williams AP. Inventory compilation for renewable energy systems: the pitfalls of materiality thresholds and priority impact categories using hydropower case studies. International Journal of Life Cycle Assessment. 2015 Oct 15;20(12):1701-1707. doi: 10.1007/s11367-015-0976-6
Author
RIS
TY - JOUR
T1 - Inventory compilation for renewable energy systems: the pitfalls of materiality thresholds and priority impact categories using hydropower case studies
AU - Gallagher, J.
AU - Styles, D.
AU - McNabola, A.
AU - Williams, A.P.
PY - 2015/10/15
Y1 - 2015/10/15
U2 - 10.1007/s11367-015-0976-6
DO - 10.1007/s11367-015-0976-6
M3 - Article
VL - 20
SP - 1701
EP - 1707
JO - International Journal of Life Cycle Assessment
JF - International Journal of Life Cycle Assessment
SN - 0948-3349
IS - 12
ER -